Medium frequency induction diathermy furnace safe operation

Medium frequency induction diathermy furnace safe operation
 1. Check whether the electrical equipment, water cooling system, and sensor copper pipes are in good condition before opening the furnace. Otherwise, it is forbidden to open the furnace.
 
2. If the furnace melt loss exceeds the regulations, it should be repaired in time. It is strictly forbidden to smelt in the melted deep shovel.
 
3. There should be someone responsible for power transmission and furnace opening. It is strictly forbidden to touch the sensor and cable after power transmission. The shifter is not allowed to leave the post without permission.
 
Bit, pay attention to the sensor and the external situation.
 
4. When loading, check whether there are any inflammable, explosive and other harmful materials in the charge. If it should be removed in time, it is forbidden to use cold materials.
 
The wet material is directly added to the molten steel, and after the molten liquid is filled to the upper portion, it is strictly prohibited to add a large block to prevent the capping.
 
5. It is strictly forbidden to mix iron filings and iron oxides when making furnaces and simmering sputum.
 
6. The pouring site and the pit in front of the furnace should be free of obstacles and no water to prevent the molten steel from falling to the ground.
 
7. The molten steel is not allowed to be overfilled. When the hand is raised and poured, the two should cooperate with each other. The walk should be stable and not allowed to go.
 
Emergency stop, after pouring, the surplus steel should be poured into the designated place, it is strictly prohibited to fall.
 
8. The medium frequency generator room should be kept clean. It is forbidden to bring inflammable and explosive materials and other debris into the room. It is forbidden to smoke indoors.